S.No |
Name of Research scheme |
Executing Institute/Agency |
Particulars |
|
1 |
Creation of complete range of independent testing facilities for expansion joints at CRRI.(B-34)
(F.No. RW/NH-34061/1/2005-S&R(B) |
Central Road Research Institute (CRRI)
|
Sanctioned date: 30th June 2005
Revised target date of completion:
Yet to be fixed
Cost: Rs 580 lakhs
Ministry’s share= 220 lakhs
CRRI’s share = 360 lakhs |
|
2 |
Development of an expert system for distress diagnostics of concrete bridges (Fuzzy based) (B-35).
(F.No. RW/NH-34061/2/2008-S&R(B) |
Indian Institute of Technology, Delhi.
|
Sanctioned date: 27th May 2008
Target date of completion:
January, 2010
Cost: Rs50.00 lakhs |
|
3 |
Development of Standard Drawings for Composite girders (with steel girders) ) (B-36).
(F.No. RW/NH-34066/2/2007-S&R(B) |
Institute for Steel Development and Growth
(INSDAG). |
Sanctioned date: 25th July 2008
Target date of completion:
December, 2009
Cost: Rs16.70 lakhs
|
|
4 |
Development of Explanatory Commentary on Standard Specifications and Code of Practice for Road Bridge Section VI Composite Constructions Limit State Design (First Revision) ) (B-37).
(F.No. RW/NH-34066/6/2008-S&R(B) |
Institute for Steel Development and Growth
(INSDAG).
|
Sanctioned date:
6th November 2008
Target date of completion:
July, 2010
Cost: Rs11.30 lakhs
Ministry’s share= 7.49 lakhs
|
|
S.No |
Name of Research scheme |
Executing Institute/Agency |
Particulars |
|
5 |
Revision of Ministry’s Specifications for Roads and Bridges Works (B-38)
(F.No. RW/NH-34066/9/2000-S&R(B) |
Indian Roads Congress (IRC) |
Sanctioned date: 31st March 2009
Target date of completion:
October, 2010
Cost: Rs 40.00 lakhs
|
|
6 |
Explanatory commentary for Code of Practice for concrete Road bridges (Limit State Method) (B-39)
(F.No. RW/NH-35075/9/2006-S&R(B)
|
Indian Roads Congress (IRC)
|
Sanctioned date: 28th May 2009
Target date of completion:
January, 2010
Cost Rs 14.00 lakhs
|
|
7 |
Hydraulic investigations for design of raft foundations for bridges (B-40)
(F.No. RW/NH-36087/1/2009-S&R(B)
|
Indian Institute of Technology, Mumbai
|
Sanctioned date: 28th May 2009
Target date of completion:
June, 2011
Cost: Rs 22.008 lakhs
|
|
8. |
Static and Dynamic Load Test for piles (B-41)
(F.No. RW/NH-34075/1/2009-S&R(B) |
Indian Institute of Technology, Mumbai |
Sanctioned date 23rd July, 2009
Target date of completion July 2011
Cost Rs.26.00 lakhs |